Conditions: The subscription is tacitly renewed and invoiced every year.
The RSS Feed Power contains all concerned planned and unplanned non-usabilities for production, consumption and storage facilities that are published for the current calendar day (0:00 UTC – 24:00 UTC) and 3 hours of the previous day (21:00 UTC – 24:00 UTC). History will be included for the updated events (progressive feed). Data will be included for all countries reported by a market participant to the EEX Transparency Platform (AT, BE, CH, DE, CZ, GB, HU, NL, IT). Based on the Manual of Procedures on Data Reporting by ACER the following fields are included: Message ID, Event Status, Type of Unavailability, Type of Event, Publication date/time, Event Start, Event Stop, Unit of Measurement, Unavailable Capacity, Available Capacity, Installed Capacity, Reason of the Unavailability, Remarks, Fuel Type, Bidding Zone, Affected Asset or Unit, Affected Asset or Unit EIC Code, Market Participant, Market Participant Code. The data is provided in XML format.
Frequency: Real-time
Usage Right: Internal
After placing the order, please provide us with the respective IP address/ range which should be whitelisted for the RSS-Feed.
Please send an email to access.datasource@eex-group.com