EEX RSS-Feed Power

Back to search results

EEX RSS-Feed Power

Conditions: The subscription is tacitly renewed and invoiced every year.

 

The RSS Feed Power contains all concerned planned and unplanned non-usabilities for production, consumption and storage facilities that are published for the current calendar day (0:00 UTC – 24:00 UTC) and 3 hours of the previous day (21:00 UTC – 24:00 UTC). History will be included for the updated events (progressive feed). Data will be included for all countries reported by a market participant to the EEX Transparency Platform (AT, BE, CH, DE, CZ, GB, HU, NL, IT). Based on the Manual of Procedures on Data Reporting by ACER the following fields are included: Message ID, Event Status, Type of Unavailability, Type of Event, Publication date/time, Event Start, Event Stop, Unit of Measurement, Unavailable Capacity, Available Capacity, Installed Capacity, Reason of the Unavailability, Remarks, Fuel Type, Bidding Zone, Affected Asset or Unit, Affected Asset or Unit EIC Code, Market Participant, Market Participant Code. The data is provided in XML format.

Frequency: Real-time

Usage Right: Internal

After placing the order, please provide us with the respective IP address/ range which should be whitelisted for the RSS-Feed.

Please send an email to access.datasource@eex-group.com

FROM: € 500.00 / MONTH
Download Specifications

Welcome to the EEX Group Webshop

General Conditions

Any user of the EEX Group Webshop expressly agrees to the Terms of Use of the Webshop and the General Conditions.

See Terms of Use

 

See General Conditions:

EEX Group DataSource Products

EPEX SPOT Market Data

EPEX SPOT E-Learning